550 ton steel construction, 55 meters between towers, adjustable height, adjustable stage, adjustable in adjustable decks.

Adjustable mezanine 220 meters, one drive, 4 screwjacks, 2 cranes, man lift, expanded 10 meters, 4 stabilizer and tail. 

Close Menu